{"id":3960,"date":"2021-03-13T06:09:45","date_gmt":"2021-03-13T06:09:45","guid":{"rendered":"http:\/\/invbat.com\/blog2\/?p=3960"},"modified":"2021-03-13T06:09:45","modified_gmt":"2021-03-13T06:09:45","slug":"to-finish-one-product-a-the-process-start-from-machine-1-for-2-minutes-then-machine-2-for-1-minutes-and-finally-in-machine-3-for-2-minutes-for-product-b-and-product-c-the-time-needed-are-shown-in","status":"publish","type":"post","link":"https:\/\/invbat.com\/blog2\/index.php\/2021\/03\/13\/to-finish-one-product-a-the-process-start-from-machine-1-for-2-minutes-then-machine-2-for-1-minutes-and-finally-in-machine-3-for-2-minutes-for-product-b-and-product-c-the-time-needed-are-shown-in\/","title":{"rendered":"<a href=\"https:\/\/www.invbat.com\/24b.html\"><font color=\"blue\">  To finish one Product A, the process start from machine 1 for 2 minutes then machine 2 for 1 minutes and finally in machine 3 for 2 minutes. For Product B and Product C the time needed are shown in the table below. Compute how many product A , product B, and Product C was produced by reading the total runtime of machine 1, machine 2, and machine 3. <\/font><\/a>"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.invbat.com\/24b.html\">\nTo finish one Product A, the process start from machine 1 for 2 minutes then machine 2 for 1 minutes and finally in machine 3 for 2 minutes. For Product B and Product C the time needed are shown in the table below. Compute how many product A , product B, and Product C was produced by reading the total runtime of machine 1, machine 2, and machine 3.\n<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image\"><a href=\"https:\/\/invbat.com\/adspayment.html\"><img loading=\"lazy\" decoding=\"async\" width=\"717\" height=\"153\" src=\"https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2021\/02\/invbat_ads_2021_4A.png\" alt=\"\" class=\"wp-image-3588\" srcset=\"https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2021\/02\/invbat_ads_2021_4A.png 717w, https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2021\/02\/invbat_ads_2021_4A-300x64.png 300w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/a><figcaption><a href=\"https:\/\/invbat.com\/adspayment.html\">Advertise and all you students and teachers will get one month free trial of personal memory assistant<\/a><\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>To finish one Product A, the process start from machine 1 for 2 minutes then machine 2 for 1 minutes and finally in machine 3 for 2 minutes. For Product B and Product C the time needed are shown in the table below. Compute how many product A , product B, and Product C was &hellip; <a href=\"https:\/\/invbat.com\/blog2\/index.php\/2021\/03\/13\/to-finish-one-product-a-the-process-start-from-machine-1-for-2-minutes-then-machine-2-for-1-minutes-and-finally-in-machine-3-for-2-minutes-for-product-b-and-product-c-the-time-needed-are-shown-in\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;<a href=\"https:\/\/www.invbat.com\/24b.html\"><font color=\"blue\">  To finish one Product A, the process start from machine 1 for 2 minutes then machine 2 for 1 minutes and finally in machine 3 for 2 minutes. For Product B and Product C the time needed are shown in the table below. Compute how many product A , product B, and Product C was produced by reading the total runtime of machine 1, machine 2, and machine 3. <\/font><\/a>&#8220;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[115,114],"tags":[],"class_list":["post-3960","post","type-post","status-publish","format-standard","hentry","category-cramer-rule","category-linear-algebra-problem"],"_links":{"self":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/3960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/comments?post=3960"}],"version-history":[{"count":1,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/3960\/revisions"}],"predecessor-version":[{"id":3961,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/3960\/revisions\/3961"}],"wp:attachment":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/media?parent=3960"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/categories?post=3960"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/tags?post=3960"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}