{"id":8868,"date":"2022-09-21T13:12:48","date_gmt":"2022-09-21T13:12:48","guid":{"rendered":"http:\/\/invbat.com\/blog2\/?p=8868"},"modified":"2022-09-21T13:16:01","modified_gmt":"2022-09-21T13:16:01","slug":"openfmb-open-field-message-bus","status":"publish","type":"post","link":"https:\/\/invbat.com\/blog2\/index.php\/2022\/09\/21\/openfmb-open-field-message-bus\/","title":{"rendered":"<a href=\"https:\/\/openfmb.ucaiug.org\/ \">OpenFMB, Open Field Message Bus: The Open Field Message Bus (OpenFMB) interoperability framework is a standard ratified in 2016 by North American Energy Standards Board (NAESB)?, a leading energy industry Standards Development Organization (SDO) accredited by the American National Standards Institute (ANSI). The OpenFMB Users Group was created in 2018 after a transition to the Utility Communications Architecture International Users Group (UCAIug) from a Priority Actio?n Plan previously organized by the Smart Grid interoperability Panel (SGIP), which is now part of the Smart Electric Power Alliance (SEPA).?<\/a>"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><a href=\"https:\/\/invbat.com\/361.html\"><img loading=\"lazy\" decoding=\"async\" width=\"984\" height=\"273\" src=\"https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2.png\" alt=\"\" class=\"wp-image-8551\" srcset=\"https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2.png 984w, https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2-300x83.png 300w, https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2-768x213.png 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[611,612,617,606,616,615,622,623,621,614,620,624],"tags":[],"class_list":["post-8868","post","type-post","status-publish","format-standard","hentry","category-adms","category-der","category-electric-grid-modernization","category-iot-internet-of-things","category-it-ot-technology-merging","category-mesa","category-naesb","category-sdo","category-sepa","category-seto","category-sgip","category-ucaiug"],"_links":{"self":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/8868","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/comments?post=8868"}],"version-history":[{"count":3,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/8868\/revisions"}],"predecessor-version":[{"id":8872,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/8868\/revisions\/8872"}],"wp:attachment":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/media?parent=8868"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/categories?post=8868"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/tags?post=8868"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}