{"id":9017,"date":"2022-10-01T14:03:48","date_gmt":"2022-10-01T14:03:48","guid":{"rendered":"http:\/\/invbat.com\/blog2\/?p=9017"},"modified":"2022-10-01T14:03:48","modified_gmt":"2022-10-01T14:03:48","slug":"the-midcontinent-independent-system-operator-miso-said-it-received-956-interconnection-requests-representing-171-gw-of-new-generation-a-record-volume-during-its-2022-generator-interconnection-queue","status":"publish","type":"post","link":"https:\/\/invbat.com\/blog2\/index.php\/2022\/10\/01\/the-midcontinent-independent-system-operator-miso-said-it-received-956-interconnection-requests-representing-171-gw-of-new-generation-a-record-volume-during-its-2022-generator-interconnection-queue\/","title":{"rendered":"<a href=\"https:\/\/www.power-grid.com\/td\/interconnection-demand-explodes-as-miso-reports-exponential-growth\/ \">The Midcontinent Independent System Operator (MISO) said it received 956 interconnection requests representing 171 GW of new generation, a record volume during its 2022 Generator Interconnection Queue (GIQ) application period.  Solar projects (84 GW) continued to represent the single-highest category followed by hybrid projects (34 GW) and storage projects (32 GW).  Wind projects totaled about 14 GW and natural gas project around 5 GW. &#8211;source: PowerGrid International"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><a href=\"https:\/\/invbat.com\/361.html\"><img loading=\"lazy\" decoding=\"async\" width=\"984\" height=\"273\" src=\"https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2.png\" alt=\"\" class=\"wp-image-8551\" srcset=\"https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2.png 984w, https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2-300x83.png 300w, https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2-768x213.png 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[647,610],"tags":[],"class_list":["post-9017","post","type-post","status-publish","format-standard","hentry","category-miso","category-solar-and-battery-der"],"_links":{"self":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/9017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/comments?post=9017"}],"version-history":[{"count":1,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/9017\/revisions"}],"predecessor-version":[{"id":9018,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/9017\/revisions\/9018"}],"wp:attachment":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/media?parent=9017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/categories?post=9017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/tags?post=9017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}