{"id":9691,"date":"2023-07-23T15:10:02","date_gmt":"2023-07-23T15:10:02","guid":{"rendered":"https:\/\/invbat.com\/blog2\/?p=9691"},"modified":"2023-07-23T15:10:28","modified_gmt":"2023-07-23T15:10:28","slug":"finish-product-a","status":"publish","type":"post","link":"https:\/\/invbat.com\/blog2\/index.php\/2023\/07\/23\/finish-product-a\/","title":{"rendered":"<a href=\"https:\/\/www.invbat.com\/24.html\"><font color=\"blue\">   To finish one Product A, the process start from machine 1 for 2 minutes then machine 2 for 1 minute and finally in machine 3 for 2 minutes. For Product B, the process start from machine 1 for 1 minute then machine 2 for 3 minutes and finally in machine 3 for 1 minute. For Product C the process start from machine 1 for 1 minute then machine 2 for 2 minutes and finally in machine 3 for 2 minutes. Compute how many product A, product B, and Product C was produced by reading the total runtime of machine 1 (180 min), machine 2 (300 min) and machine 3 (240 min)  <\/font><\/a>"},"content":{"rendered":"\n<p>\n<a href=\"https:\/\/www.invbat.com\/24.html\"><font color=\"blue\"> \n\nTo finish one Product A, the process start from machine 1 for 2 minutes then machine 2 for 1 minute and finally in machine 3 for 2 minutes. For Product B, the process start from machine 1 for 1 minute then machine 2 for 3 minutes and finally in machine 3 for 1 minute. For Product C the process start from machine 1 for 1 minute then machine 2 for 2 minutes and finally in machine 3 for 2 minutes. Compute how many product A, product B, and Product C was produced by reading the total runtime of machine 1 (180 min), machine 2 (300 min) and machine 3 (240 min)\n\n<\/font><\/a>\n<br><\/p>\n\n\n\n<figure class=\"wp-block-image\"><a href=\"https:\/\/invbat.com\/361.html\"><img loading=\"lazy\" decoding=\"async\" width=\"984\" height=\"273\" src=\"http:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2.png\" alt=\"\" class=\"wp-image-8551\" srcset=\"https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2.png 984w, https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2-300x83.png 300w, https:\/\/invbat.com\/blog2\/wp-content\/uploads\/2022\/08\/aitutor2-768x213.png 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>To finish one Product A, the process start from machine 1 for 2 minutes then machine 2 for 1 minute and finally in machine 3 for 2 minutes. For Product B, the process start from machine 1 for 1 minute then machine 2 for 3 minutes and finally in machine 3 for 1 minute. For &hellip; <a href=\"https:\/\/invbat.com\/blog2\/index.php\/2023\/07\/23\/finish-product-a\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;<a href=\"https:\/\/www.invbat.com\/24.html\"><font color=\"blue\">   To finish one Product A, the process start from machine 1 for 2 minutes then machine 2 for 1 minute and finally in machine 3 for 2 minutes. For Product B, the process start from machine 1 for 1 minute then machine 2 for 3 minutes and finally in machine 3 for 1 minute. For Product C the process start from machine 1 for 1 minute then machine 2 for 2 minutes and finally in machine 3 for 2 minutes. Compute how many product A, product B, and Product C was produced by reading the total runtime of machine 1 (180 min), machine 2 (300 min) and machine 3 (240 min)  <\/font><\/a>&#8220;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[734],"tags":[],"class_list":["post-9691","post","type-post","status-publish","format-standard","hentry","category-3-linear-equations-system"],"_links":{"self":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/9691","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/comments?post=9691"}],"version-history":[{"count":2,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/9691\/revisions"}],"predecessor-version":[{"id":9693,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/posts\/9691\/revisions\/9693"}],"wp:attachment":[{"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/media?parent=9691"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/categories?post=9691"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invbat.com\/blog2\/index.php\/wp-json\/wp\/v2\/tags?post=9691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}